Upgrading the Infrastructure of Two National Bank of Egypt Branches.

Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.


National Bank of Egypt
📌6th of October branch, Mohamed Naguib branch


Established on June 25, 1898, the National Bank of Egypt is one of the oldest and most prestigious commercial banks in Egypt. The bank continues to invest in infrastructure and technology to provide advanced digital services that meet the needs of its customers. The number of users of the Ahly Net service has reached 7.3 million, and the number of users of the Ahly Phone Cash wallet has reached 1.6 million.


Requirements:
🌐Redesigning the bank's internal network.
🌐Testing data cables.
🌐Reorganizing, connecting, and activating the cables.

Challenges:
🌐The absence of numbers on cables and their connections.
🌐Providing a secure and effective Wi-Fi service.
🌐Stability of cloud storage services.

Implementation:
🌐Pulling all cables and reconfiguring, renumbering, and connecting while adhering to all international work protocols.
🌐Stapling 500 points for connection and control through external servers and the main network.
🌐Testing data cables with the latest and best devices in the world, Test Fluke.
🌐Completion within 4 working days.

Results:
🌐Stabilization of all electronic services for employees and customers.
🌐The internal network was equipped with a strong infrastructure that is expandable, flexible, and facilitates subsequent maintenance procedures.
🌐Long-term cost savings.

Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Other Projects
El Kayan Technology Upgrades Egyptian Post Branch Network in 3 Days.
El Kayan Technology Upgrades Egyptian Post Branch Network in 3 Days.

El Kayan Technology reorganizes and updates the network infrastructure of the Egyptian Post branch in Alexandria Governorate, connecting floors, achieving technical stability, and achieving long-term cost savings.

Read More
El Kayan Technology Upgrades Surveillance and Networking in One Day.
El Kayan Technology Upgrades Surveillance and Networking in One Day.

El Kayan Technology organizes and installs fibre optic cables for Cleopatra Compound, leading to increased network efficiency and cost savings.

Read More
Enhanced Learning Environment: El Kayan Technology Upgrades the British School's Network.
Enhanced Learning Environment: El Kayan Technology Upgrades the British School's Network.

El Kayan Technology updates the British School's network to provide secure Wi-Fi, a stable learning environment, and long-term cost savings in just 15 days.

Read More