El Kayan Technology Successfully Develops a Fibre Optic Network for a Mall in Banha.

Update of Nile View Towers Networks - Banha

Nile View Towers- Banha
Nile View Towers is the first and largest full-service residential development in Banha, offering the greatest view of the Nile River.



Project Objective:
🌐Organize and arrange all fibre optic cables in the mall.
🌐Weld and number fiber optic wires.
🌐Test the fibre-optic cables.
🌐Operate the mall's infrastructure system.

Challenges:
🌐Lack of numbers on cables and their connections.
🌐Stabilizing cloud storage services.

Implementation:
🌐Reconfiguration, numbering, and connection of cables in compliance with all international work protocols.
🌐Welding of 384 cores for connection and control from the main light current room in the mall.
🌐Testing of fibre optic cables using the latest and best equipment in the world: Test Fluke/OTDR.
🌐Completion within 2 working days.

Results:
🌐Stabilization of all electronic services for employees, customers, and management.
🌐Connecting buildings and residential towers to the main building with the engineering offices of the mall.
🌐The internal network was provided with a strong infrastructure that is scalable, flexible, and facilitates subsequent maintenance procedures.
🌐Cost savings in the long term.

Update of Nile View Towers Networks - Banha
Update of Nile View Towers Networks - Banha
Update of Nile View Towers Networks - Banha
Update of Nile View Towers Networks - Banha
Update of Nile View Towers Networks - Banha
Update of Nile View Towers Networks - Banha
Update of Nile View Towers Networks - Banha
Update of Nile View Towers Networks - Banha
Update of Nile View Towers Networks - Banha
Other Projects
Enhanced Learning Environment: El Kayan Technology Upgrades the British School's Network.
Enhanced Learning Environment: El Kayan Technology Upgrades the British School's Network.

El Kayan Technology updates the British School's network to provide secure Wi-Fi, a stable learning environment, and long-term cost savings in just 15 days.

Read More
El Kayan Technology Upgrades Egyptian Post Branch Network in 3 Days.
El Kayan Technology Upgrades Egyptian Post Branch Network in 3 Days.

El Kayan Technology reorganizes and updates the network infrastructure of the Egyptian Post branch in Alexandria Governorate, connecting floors, achieving technical stability, and achieving long-term cost savings.

Read More
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.
Upgrading the Networks of Two National Bank of Egypt Branches in 4 Days.

El Kayan Technology successfully upgraded the internal networks of two National Bank of Egypt branches, enhancing security, stability, and efficiency within a short timeframe.

Read More